R&D and Engineering
Fully automated line design
Requirement review
Define the motor around the equipment's operating conditions.
About Us
Our Nanshan headquarters handles market development and customer communication. The Dongguan campus handles R&D, engineering validation and manufacturing.

From Nanshan to global markets
Power Motor was founded in Shenzhen in 2001. Our Nanshan headquarters handles market development, international business and customer communication. Engineering, validation and manufacturing are based in Dongguan.
We supply micro motors, custom motors and controllers. Whether you are selecting an existing product or developing new equipment, share its application, supply voltage, mounting dimensions and load requirements with our team.
Monthly output and line counts are based on company materials dated 11 September 2026; lines include automatic and semi-automatic lines. Patent totals refer to grant records archived on 20 August 2026, covering inventions, utility models and designs, rather than a live count of patents in force.

SHENZHEN · NANSHAN HEADQUARTERS
Our Nanshan headquarters handles customer communication, market development and project coordination.

Our Fenggang base in Dongguan houses motor and drive development, testing and production. On-site processes include mold making, injection molding, SMT assembly and motor assembly.

Define the motor around the equipment's operating conditions.

SMT lines and electronics assembly for motor drives and control boards.

Environmental chambers and supporting equipment are used for sample validation, with conditions agreed by project.
For your product
Balance motor selection, materials and structure around performance and assembly.
Fully automated lines designed, assembled and commissioned in-house to optimize manufacturing costs.
In-house mold making reduces outsourced tooling costs and speeds up mold changes.
FILM ARCHIVE
Three and a half minutes across our campus, engineering, manufacturing, and quality work.
The documents below are ISO or IATF management system certifications, shown with their stated scope and validity.

Certificate states through 2028-04-09
Certificate states through 2028-04-09
Certificate states through 2028-04-09
Certificate states through 2026-12-18
Certificate image: page 1 of 2.
Discuss your equipment requirements or drawings with our engineers.